Thursday, December 15, 2011

the meters are on and the heat is on in the five units

connecting the kitchen sinks

adjusting the cabinet doors

Wednesday, December 14, 2011

sinks were put in today
things will be winding down for the holidays



Monday, December 12, 2011

the countertops are here

Thursday, December 8, 2011

nailing together some basement staircase walls

Tuesday, December 6, 2011

installing the pipes for the gas meters


still doing the touchups

Monday, December 5, 2011

touching up some scuffs

threading the pipes for the gas lines

installing the kick plates

Wednesday, November 30, 2011

gas lines are going in



putting in the venting pipes

filling in the voids

ready for the winter

Monday, November 28, 2011

putting on the door pulls

putting in the transitions

tub surrounds


more painting

sealing the outlets

the start of the gas lines

Friday, November 25, 2011

Today we had Carlos from 91.5 the beat spending the first day with us for 30 deeds in 30 days. Most of the day was spent painting and I don't think he got any on himself.You can follow him on his blog at www.915thebeat.com and look for his blog. There should be some photos there from his first deed out of thirty at Habitat. Thanks Carlos we had a great day with you.

spreading the glue for the tub surround

putting up the tub surround

puttying the nail holes 

Thursday, November 24, 2011

today was a day for cleaning up

Friday, November 18, 2011

putting the cabinets together

putting in the closet hardware

Leonor's christmas tree

Thursday, November 17, 2011

adjusting the doors and putting on the door stops


installing the base boards

Wednesday, November 16, 2011

putting together the cabinets

putting up the cabinets

installing the lowers

doing some caulking

Tuesday, November 15, 2011

the start of the cabinets

still more holes

Monday, November 14, 2011

staking down the sod


putting up the silt fence

vinyl flooring is in 

putting together the cabinets